The Concrete Slab Volume Calculator tells you exactly how much concrete to order for any rectangular slab. Enter your slab length, width, and thickness in either imperial (feet and inches) or metric (metres and millimetres) — the calculator instantly outputs volume in cubic yards and cubic feet (US) or cubic metres (me...
US average: $125–$165/CY ready-mix (2025)
RESULTS
VOLUME (exact)
1.23 CY
= 33.33 cubic feet
WITH 10% WASTE — order this amount
1.36 CY
80 LB BAGS
56
60 LB BAGS
75
ESTIMATED MATERIAL COST
$170
at $125/CY ready-mix + 10% waste
SLAB VISUALISER (not to scale)
SLAB SUMMARY
THICKNESS GUIDE
Walkways, pathways
Foot traffic only
Patios, residential slabs
Standard residential
Garage floors
Passenger vehicles
Driveways
Heavy vehicles, RVs
Commercial floors
Forklifts, heavy loads
UNIT CONVERSIONS
1 cubic yard = 27 cubic feet
1 cubic yard ≈ 0.765 m³
80 lb bag ≈ 0.6 cubic feet
60 lb bag ≈ 0.45 cubic feet
25 kg bag ≈ 0.01 m³
Always order 10% extra for waste
Choose your unit system: Imperial (feet and inches, for US projects) or Metric (metres and millimetres). The calculator remembers your choice as you adjust inputs.
Enter the slab Length and Width. For irregular shapes, break the slab into rectangular sections and calculate each separately, then add the volumes.
Enter the Thickness. Use the quick preset buttons — 4 inches for a standard patio or residential floor, 6 inches for a driveway, 8 inches for commercial. Thickness is the most critical input: doubling thickness doubles the concrete needed.
Optionally enter your concrete price per cubic yard (US) or per cubic metre (metric) to get a cost estimate. US ready-mix averages $125–$165/CY in 2025; check with your local supplier for exact pricing.
Read the results: Volume without waste, Volume with 10% waste (always order this amount), number of pre-mixed bags if hand-mixing, and total estimated material cost. Click COPY to save the full result.
Calculating concrete for a 20 ft × 20 ft garage floor, 5 inches thick: Step 1: Convert thickness to feet 5 inches ÷ 12 = 0.4167 ft Step 2: Calculate volume in cubic feet 20 ft × 20 ft × 0.4167 ft = 166.67 cubic feet Step 3: Convert to cubic yards 166.67 ÷ 27 = 6.17 cubic yards Step 4: Add 10% waste 6.17 × 1.10 = 6.79 CY → order 7 CY Step 5: Bag count (if hand-mixing — not recommended at this scale) 166.67 CF ÷ 0.6 CF/bag = 278 × 80 lb bags Step 6: Cost estimate at $140/CY 6.79 CY × $140 = $951 for concrete material only
Last updated: April 29, 2026 · Formula verified by EagleCalculator team · Eagle-eyed accuracy for every calculation.